998,8 kWp, GIOIA DEL COLLE (BA)
Code: IA10-222 Power: 998.8 kWp Year of installation: 2010 Location: GIOIA DEL COLLE (BA) Technical features: 4540 modules Trina, 220 Wp 2 inverter Laying: ground CO2 emissions avoided: Equivalent to 700,16 t per year |